Skip to content
Nordman Clipper.JPG

Image -

Nordman Clipper.JPG

The Normand Clipper vessel innstalling the NO-UK fiber cable.
Halvard Bøe / Green Mountain
License:
Media Use
The content may be downloaded by journalists, bloggers, columnists, creators of public opinion, etc. It can be used and shared in different media channels to convey, narrate, and comment on your press releases, posts, or information, provided that the content is unmodified. The author or creator shall be attributed to the extent and in the manner required by good practice (this means, for example, that photographers should be attributed).
By:
Halvard Bøe / Green Mountain
File format:
.jpg
Size:
6048 x 4024, 4.1 MB
Download

Topics

Categories

Contacts

Mette Berger Gulbrandsen

Mette Berger Gulbrandsen

Press contact Chief Marketing & Communications Officer +47 92838645
Svein Atle Hagaseth

Svein Atle Hagaseth

Press contact Chief Executive Officer +47 982 22 999

Related content

NO-UK fiber cable installation operations commenced

NO-UK fiber cable installation operations commenced

Installation of the 700-kilometer-long submarine fiber cable started at Green Mountain’s data center today. This new cable route connects the west coast of Norway with Newcastle and will significantly increase data capacity between Norway, the UK, and the rest of the world.

About Green Mountain

Green Mountain designs, builds and operates highly secure, innovative and sustainable data centers in Norway and the UK. The data centers are powered by low-cost, 100 percent renewable power and are world-leading on energy efficiency.

Green Mountain

Hodneveien 260
4150 Rennesøy
Norge